• Some stock photographs may show options that are not included. Please check product description.
Plumb Pak

Plumb Pak EZ Series PP23802 Sink Supply Tube, 3/8 in Inlet, Compression Inlet, 1/2 in Outlet, FIP Outlet, 16 in L

Mfg.#
PP23802
Sku#
2579761

* Estimated stock levels as of Sun, May 3, 2026. All items subject to prior sale. Prices may vary between stores and online. Please call ahead to confirm availability of items marked as Limited Stock.

Description

Plumb Pak EZ Sink Supply Tube, Inlet Connection Size: 3/8 in, Inlet Connection Type: Compression, Outlet Connection Size: 1/2 in, Outlet Connection Type: FIP, Tubing Material: Stainless Steel, 16 in L

Specifications

General

Inlet Connection Size 3/8 in
Inlet Connection Type Compression
Outlet Connection Size 1/2 in
Outlet Connection Type FIP
Series EZ

Dimensions

Length 16 in

Manufacturing Details
The following information is subject to change without notice

Country of Origin CN

PLEASE NOTE: Product information for this item was provided by a third-party source and has not been verified. Please use our feedback button to report any errors. Read our Terms of Use.

Please choose a store for pricing and availability.

Find Your Local Store
Feedback