Leveling a Droopy Floor

 

Break out a section of the basement floor and create a 24x24x8inch concrete pad for the jack to sit on.Let concrete sit of at least a week. Put jack on concrete. Insert a 4x4 pressure-treated beam long enough to cross several joists.Raise jack until beam is snug against joist, and rise jack ┬╝ turn again. Wait a week and rise another quarter turn.Repeat process until droop is gone.


Other Resources:

All How-To Tips & Guides

Other Project Resources

Browse Hardware Products featured on Sutherlands.com

Sutherlands® Credit

Sutherlands® provides these project tips and guides as a service to our visitors. Due to possible variance in conditions, equipment, materials and individual skill levels, Sutherlands® assumes no responsibility for losses or injuries incurred during maintenance or repair of your property. Sutherlands® assumes no liability for errors or omissions in the Resources section of this website. Please read and follow any safety precautions provided by tool and equipment manufacturers, and consult a building professional in your area if you have any questions about a repair project. Always check your local codes before building, and obtain the required building permits.